• Serving Hartford & Middlesex County, CT
Call us(860) 883-6201
Call us(860) 883-6201
Excavation · Hartford & Middlesex County, CT

Foundation Excavation in Hartford & Middlesex County

Foundation excavation for new homes and additions. We dig with our own excavators to your plans and the surveyor's stakes, so the hole is ready when the footing crew arrives.

Foundation excavation: footing forms set in a deep house excavation
Family-run, 40 years in contracting
What We Dig

New Homes and Additions

We dig to the size and depth on the plans so the footing crew can set their forms without any rework.

New foundation on a lot cut out of the woods
  1. New homes

    Full basements and crawl spaces, dug to the depth and footprint on the plans, with room around the walls for the forms.

  2. Additions

    This means digging next to a house you're living in. The machine works close to the existing foundation, the lawn and whatever runs underground, so we take it slowly and carefully.

  3. Wooded lots

    If the lot is still wooded, we can clear it first and then dig with the same machines.

    Lot clearing
  4. We build homes ourselves, so we know what the footing crew needs from the hole.
Estimates

How a Foundation Dig Goes

Most house foundations are dug in a few days. Ledge and water add time.

  1. Send the plans

    The plans, the site plan and the permit status tell us the size, depth and where the house sits.

  2. Survey marks and 811

    The surveyor stakes the house, and we file a Call Before You Dig (811) request so buried utilities are marked.

  3. Dig to the marks

    We dig to the depth and footprint on the plans, with working room for the footing forms.

  4. Ready for footings

    We leave a flat, firm bottom at the right elevation, ready for the footing crew.

Mini excavator digging right beside a finished house
Additions

Digging Next to a House You Live In

An addition is a tighter dig than a new house. The hole sits right against a foundation that's holding up your home, and the ground between the house and the street usually has water, sewer, gas or electric lines in it.

Every one of those lines has to be marked through Call Before You Dig (811) before the bucket goes in. We file that request ourselves before every job.

The other thing to plan is where the machine gets in and where the dirt goes. On a finished lot, that's often the side yard and the lawn, and both will need putting back.

Send Your Plans
Crew setting footing forms in a trench
Before You Hire

Permits and Registration

A new foundation or an addition needs a building permit from your town's building department. The homeowner or builder pulls the permit, and we dig to it. We're glad to help with what the town needs from the excavation side, and if you already have the permit, it helps to mention it when you ask for an estimate.

In Connecticut, an excavation contractor working on a home of one to six units needs a Home Improvement Registration from the Department of Consumer Protection. It's worth asking any contractor for the number and checking it with the state.

Request an Estimate
Foundation hole with filter fabric and crushed stone going down for the floor
Cost

Foundation Excavation Cost

The size of the hole is only part of what sets the price.

Most foundation digs are priced by the job. To get started, send the plans and a few photos of the lot.

  • Size and depth: a full basement moves far more material than a crawl space.
  • Ledge: hitting bedrock slows the dig and can mean breaking rock.
  • Water: a high water table or a wet spell means pumping and waiting.
  • Access: how close a machine can get, and what's in the way.
  • Where the dirt goes: spreading it on site for backfill and grading costs less than trucking it away.
  • Permits and inspections: waiting on an inspection can hold up the dig, and that costs time.
Request an Estimate
Questions

Questions About Digging a Foundation

Have a different question? Give us a call(860) 883-6201
  • Deep enough for the footings to sit below the frost line, and deeper for a full basement. The plans set the exact depth, and we dig to them.

  • Wider than the walls on every side, so the crew has room to set forms, waterproof and install footing drains. The plans and your foundation contractor decide how much.

  • Yes, a new house or an addition needs a building permit from your town's building department before the dig starts. The homeowner or builder usually pulls it.

  • Some of it goes back in as backfill around the foundation, and some is used to grade the lot. Anything left over is spread on site or trucked away.

  • You'll want an excavation contractor. It's a good idea to ask for their Home Improvement Registration number and a certificate of insurance, and to ask who files the Call Before You Dig request.

Tell Us What You're Building

Send the plans if you have them, or a few photos of the lot, and we'll get back to you by email. You can also call (860) 883-6201.